Why one product does not fit a whole hotel
Guest rooms, corridors and wet areas fail for different reasons. A floor chosen on appearance alone usually fails first in the zone nobody photographed: the service corridor behind the kitchen, the bathroom that is cleaned twice a day, or the lift lobby where trolleys turn.
Selecting by zone rather than by a single product is the fastest way to avoid call-backs. The same supplier can usually cover every zone from one range, but the construction, the wear layer and the joint treatment should change from zone to zone.
Zone-by-zone selection
| Hotel zone | Suitable PVC construction | Main reason |
|---|---|---|
| Guest rooms | Heterogeneous vinyl sheet in a wood design, wear layer 0.30–0.55 mm | Warm and quiet underfoot, with photorealistic wood at a lower cost than timber |
| Corridors and lift lobbies | Homogeneous vinyl sheet, or heavy-duty heterogeneous | The colour and pattern run through the full thickness, so wear stays invisible |
| Guest bathrooms | Waterproof SPC, or vinyl sheet with sealed and welded joints | Standing water, frequent cleaning cycles and a fully sealed floor |
| Restaurants, bars and kitchens | Slip-resistant SPC or safety vinyl, coved where it meets the wall | Wet, greasy and heavily cleaned working floors |
| Conference and public areas | Design-led heterogeneous or homogeneous | High footfall plus a finish the client sees every day |
| Back of house | Heavy-duty homogeneous, loose-lay or glue-down | Service traffic, trolleys, storage and cleaning chemicals |
Where a zone sits above another occupied space — a guest room above a ballroom, for example — the acoustic requirement usually decides the specification before the decorative one does.
Acoustic performance in guest rooms
Impact sound is often the complaint that reaches reception first. An acoustic heterogeneous vinyl can reach an impact sound reduction of up to 19 dB (EN ISO 717-2); where the structural target is higher, the sheet is combined with an acoustic membrane rather than replaced by a heavier product.
See the acoustic heterogeneous vinyl page for the measured figures and the subfloor conditions they assume.
Fire performance and what the classification means
Hotel specifications usually quote a reaction-to-fire classification. For PVC flooring the common European classification is EN 13501-1 Bfl-s1. Where a specification still follows the older British route, BS 476 Class 1 is quoted.
Both are test classifications, not certificates. They describe how a specimen performed in a named test, and they should always be read together with the report they come from — including the substrate and the adhesive used in the test. If a supplier presents a classification without saying which test produced it, ask for the report.
Slip resistance in wet areas
Bathrooms, kitchens and pool surrounds need a measured slip resistance rather than a description. Values are normally quoted as R-classes tested to DIN EN 16165, the standard that replaced DIN 51130. The class should follow the cleaning regime and the gradients of the actual floor, not a default.
The slip resistance guide explains how the R-classes are measured and where each one is normally applied.
Documents a hotel project normally asks for
- Third-party test reports for the product line offered — reaction to fire, mould resistance, and physical and chemical properties including VOC
- A technical datasheet with wear layer, total thickness, format and installation method
- Reaction-to-fire and slip-resistance classifications with the test method named
- Physical samples or a sample book, so colour and surface texture can be approved against the real material
- Declaration of Performance and conformity documentation where the project is inside the EU
- Installation guidance covering subfloor preparation, and welding where joints must be sealed
Which reports apply to which product line — and how report numbers are checked — is explained on the how to read a flooring test report page, and the reports themselves are listed on the test reports page.
Commercial terms for a project order
| Item | Standard position |
|---|---|
| Minimum order quantity | 500 m² per colour. Colours are counted separately, because production is set up per colour — a project using three colours normally means three minimum quantities |
| Lead time | About 7–10 days for standard flooring orders, counted from written confirmation of the specification. Project quantities and special colour matching are confirmed order by order |
| Shipping terms | FOB Shanghai. EXW and CFR are also quoted |
| Samples | Free of charge; the buyer pays the courier cost |
Full details, including what a quotation does and does not include, are on the ordering, samples and quotation page.
Planning checklist for a hotel project
- Split the building into zones and note the area of each one before choosing any product.
- Count colours, not only square metres — the minimum order applies per colour.
- Confirm the subfloor type and condition in every zone; renovation projects often have mixed substrates.
- Decide which joints must be sealed and welded, and where coving is needed against wet walls.
- Collect the classifications the client's consultant will ask for, each with the test method named.
- Agree the documentation package and the sample approvals before production starts, not after.
To compare constructions side by side, see homogeneous versus heterogeneous vinyl.
Frequently asked questions about hotel flooring
What flooring is best for hotel guest rooms?
Heterogeneous vinyl sheet in a wood design is the usual choice for guest rooms. It is warm and quiet underfoot, it gives a photorealistic wood finish without the cost or the maintenance of timber, and an acoustic version can reach an impact sound reduction of up to 19 dB (EN ISO 717-2). Match the wear layer to the traffic the room will actually see, and allow for a fully sealed or welded floor if the room has an en-suite bathroom.
Can we use one flooring product for the whole hotel?
It can be done, but it is rarely the best answer. Guest rooms, corridors and wet areas fail for different reasons, so the construction, the wear layer and the joint treatment should change from zone to zone. One range from a single supplier can normally cover every zone, which keeps the colours and the documentation consistent across the project.
How much flooring should we order for a hotel project?
Work out the nett area zone by zone, add a cutting allowance, and then count the colours. Our standard minimum is 500 m² per colour, and colours are counted separately because production is set up per colour, so a project using three colours normally means three minimum quantities. For project specifications, OEM colours or first trial orders the minimum can be negotiated — send us the colour split and the quantity and we will confirm in writing what is possible.
Do you supply slip-resistant flooring for hotel bathrooms and kitchens?
Yes. Wet areas are normally specified with an R-class measured to DIN EN 16165, the standard that replaced DIN 51130, and the class should follow the cleaning regime and the floor gradients on site. Where the floor is also likely to be hosed down or greasy, coving and sealed joints matter as much as the R-class itself.
What is the lead time for a hotel project order?
For standard flooring orders, production takes about 7–10 days from written confirmation of the specification. Project quantities, special colour matching and orders that need sample approval first are confirmed order by order, because the schedule depends on the colour split and the quantity. The binding date for your order is the one shown on your proforma invoice.
Do you provide samples for a hotel project?
Yes — samples are free of charge and the buyer pays the courier. We recommend approving colour, surface texture and wear layer against a physical sample before production, because the same decor can look different on a screen, and a hotel project usually has to be approved by more than one person.