Static control is a system, not a single product. This guide explains resistance classes, the mandatory grounding system, and which floor fits your environment.
Request a Quote| Parameter | Conductive | Dissipative |
|---|---|---|
| Resistance (EN 1081) | 10⁴ – 10⁶ Ω | 10⁶ – 10⁹ Ω |
| Discharge speed | Rapid drain | Controlled, slower |
| Typical use | Electronics production, explosive / flammable zones, operating theatres | Server rooms, labs, healthcare ESD zones, general electronics |
| Body voltage (IEC 61340-4-5) | ≤ 100 V (extreme) | ≤ 2 kV acceptable (EN 1815 antistatic) |
| Backing | Carbon-black conductive network + conductive adhesive | Static-dissipative compound + conductive adhesive |
ESD vinyl is only compliant when the full system is installed. Three elements are non-negotiable:
| Element | Role |
|---|---|
| Conductive adhesive | Bonds the sheet and carries charge from the floor into the grid (≈0.22–0.32 kg/m²) |
| Copper-strip grid | Laid under the floor in a perimeter + cross pattern, connected to earth ground |
| Proper earthing point | Certified earth connection per local electrical code; verified by post-install resistance test |
A conductive floor is one component. The path is built by more than one trade — this is a division of work, not a performance guarantee.
| Role | Normally responsible for | Record that proves it |
| Flooring contractor | Laying conductive adhesive at the stated spread rate; copper strip layout and overlap; bonding the strip to the earthing terminal | Installation record plus resistance readings, with instrument and test voltage noted |
| Electrical contractor | Earth busbar, earth electrode, earth resistance | Earth resistance test record |
| Client / designer | Position of earthing points, target limits, acceptance criteria | Design note or acceptance specification |
| Material supplier (us) | Conductive adhesive and copper strip specifications, installation instructions | TDS and this table |
An ordinary multimeter at the wrong test voltage reports a number that means nothing. Check the meter, the probe spacing and the applied voltage before questioning the floor.
Measure strip-to-terminal, not only surface-to-surface. A floor that reads correctly against itself can still be isolated from earth.
Gaps and dry joints appear as isolated patches. Map where each reading was taken; a single reading does not represent a room.
| Environment | Recommended | Reason |
|---|---|---|
| Semiconductor / PCB line | DissipativeDissipative||
| Explosive / flammable area | Conductive | Prevents ignition from static spark |
| Pharma cleanroom / GMP | DissipativeDissipative||
| Server room / data centre | Dissipative | Controlled discharge; equipment-safe |
| Hospital ESD zone / OR | Conductive | Infection control + static safety; floor-to-wall cove sealing |
| Laboratory / R&D | Dissipative | General static protection, moderate traffic |
Our technical team designs the full conductive system — flooring, adhesive, grounding grid and welding — with test reports.
Report-backed values are third-party tested (Intertek, SGS) and published on our Test Reports page. Other classifications are product-performance data supported by in-house laboratory testing and are available on request.
Four details get you a quoted price
Send these four by email or WhatsApp and we reply with a technical data sheet and a firm price. With fewer details we can only quote a range.