Exhibition Notes

ARCH:ID 2024: From PVC Sheet Flooring to a Whole System

Four days at ICE BSD on stand 109. The order that grew did not grow in volume — it grew a category, from flooring into hospital handrail and wall protection.

At ARCH:ID 2024 in Jakarta, our order book moved sideways rather than up. An existing customer who bought PVC sheet flooring from us expanded the same order into the hospital handrail and wall protection range. New buyers were not the story of the four days; a category added to an existing account was.

We spent four days at ARCH:ID in Jakarta — the fourth edition of Indonesia's architecture exhibition and conference, held at ICE BSD in Halls 5 and 6, on stand 109.

The room was full of architects and interior professionals with projects in mind, not products in mind, and few of them arrived shopping for sheet flooring specifically. What moved was quieter.

That shift is the subject here, because it is the one thing a stand does better than any catalogue.

The show, in plain facts

EventARCH:ID — The 4th Indonesia Architecture Exhibition & Conference
Dates22–25 February 2024
VenueICE BSD, BSD City — Halls 5–6
Stand109
Listed categoryPVC floor accessories
UNITECH NEXUS stand 109 at ARCH:ID 2024 in ICE BSD BSD City, showing the accessory sample display and product panels
Stand 109 in Halls 5–6 at ICE BSD. Sample display to the left, application panels behind, and a counter rather than a screen — the stand was built for junctions, not for slides.

Event reference: arch.id — the official ARCH:ID site, organised by the Indonesian Institute of Architects (IAI) and PT CIS Exhibition.

No launch, no debut. A working stand built around samples rather than screens.

A design-led show brings a broad audience by design

ARCH:ID is built for architects and interior professionals, and that shapes who walks past. They arrive with a project in mind — a hotel corridor, a clinic, a retail floor. Flooring is one line item among many.

The consequence is worth stating plainly. A flooring manufacturer should not expect this audience to be pre-sold on sheet vinyl. It should expect them to be interested in a finished surface, and mildly irritated by a stand that only answers questions about one layer of it.

That irritation is the opening. A well-built sample rack turns it into a conversation.

The floor is still what they come for

The architects who stopped at the stand were not shopping for handrail. They were specifying a floor — a corridor, a ward, a treatment room — and the questions arrived in that order: what the surface is, how the seams close, how it meets the wall.

PVC sheet flooring answers those questions well in most healthcare interiors. It is seamless once welded, it turns up the wall as a cove instead of stopping at a skirting, and it can be cleaned without joints that collect. That is the anchor specification, and it is why the floor is decided before anything else in the room.

Everything else on the stand exists to finish that specification. Which is why the accessory conversation works here and rarely anywhere else: the visitor has already decided what the floor is, and is now working out how to terminate it.

Cross-selling starts at the sample rack

Put a roll of sheet on a stand and you are selling a material. Put the same roll next to its skirting, its capping strips and its adhesive, and you are selling a finished floor. The conversation changes on its own.

Colour range of PVC capping strips and cove formers hung on the sample rack at the UNITECH NEXUS stand at ARCH:ID 2024
The sample rack at stand 109. Profiles are hung against the sheet swatches above them, so the matching question answers itself before anyone speaks.

What visitors began asking about went well beyond the sheet:

How the wall base meets the floor. Not a catalogue question — a junction question. Cove profile, shadow gap or flat base, and how the upstand is finished at the corner. It cannot be answered properly over a PDF.

How the corridor survives a trolley. In a hospital, wall protection stops being decoration. Handrail height, impact resistance and how the rail terminates at a doorway are specified, not chosen. An architect will test those against a real section, not a data sheet.

Which adhesive suits the substrate. Concrete moisture, old adhesive residue, underfloor heating — the answer changes, and it changes fastest when someone can point at the slab.

None of these are upsells in the pushy sense. They are completions. The customer was buying a floor; the accessories are what make it a floor.

Why these categories belong in one order

There is an argument for buying sheet from one supplier and accessories from another, usually price. It tends to lose on three points.

One specification, one place it can go wrong. Sheet thickness and profile have to agree. When they come from the same source, disagreement is a production problem the supplier owns rather than a site problem the installer discovers.

Colour continuity across components. The capping strip, the wall base and the sheet are meant to read as one surface. Sourcing them separately turns a matching task into a negotiation.

One quality system. Our accessory range is supplied under the GREEN POINT brand and sits inside the same quality system as the sheet — the same incoming inspection, the same documentation trail. Two suppliers means two answers when a client asks for a test report.

What had to be ready before any of that worked

Cross-selling fails quietly when the second category is not actually sellable. Three things had to be true before a show conversation could become an order.

The accessory colours had to be matched to the sheet range, not merely available. The minimum order had to work alongside a flooring order, instead of demanding its own container. And the lead times had to run together, so a customer was not waiting on handrail after the floor had already shipped.

None of that is a sales technique. It is catalogue and logistics work, and it is the real precondition for a broader order.

Four questions before booking the next stand

  1. Can the second category be shown, not described? If the accessories live in a brochure rather than on the stand, the cross-sell will not happen.
  2. Are the categories priced and packed to travel together? Alignment beats assortment.
  3. Does the audience arrive with a project? Design-led shows reward systems; buyer-led shows reward price.
  4. Can one order cover both? If not, the customer simply buys the second category elsewhere.

Where that led

The floor still leads. But the orders that grew at ARCH:ID grew sideways, into the parts of the system that finish the job — and those parts are now on every stand we build, not in a folder.

Front elevation of the UNITECH NEXUS stand 109 at ARCH:ID 2024, with application panels for stair tread, handrail and skirting
Stand 109 seen head-on. Every panel behind the team is an application the flooring system has to meet — which is the half of the question a sheet-only stand leaves unanswered.

A flooring stand that only shows flooring is answering half the question the room is actually asking.

Related products: Homogeneous vinyl sheet · PVC cove profile · Wall protection and handrail

Frequently asked questions

What was ARCH:ID 2024?

ARCH:ID is Indonesia's architecture exhibition and conference. The 2024 edition was the fourth, held from 22 to 25 February 2024 at ICE BSD in BSD City, Halls 5 and 6. We exhibited on stand 109.

What changed in the customer order after ARCH:ID?

An existing customer's order stopped being a flooring order only and grew a category. The order expanded from PVC sheet flooring into the hospital handrail and wall protection range.

Why show accessories next to the sheet instead of on a separate display?

A roll of sheet on its own sells a material. The same roll placed beside its skirting, its capping strips and its adhesive sells a finished floor, and the questions change from catalogue questions to junction questions that can only be answered against a physical section.

What has to be ready before cross-selling works?

Three things: the accessory colours have to be matched to the sheet range rather than merely available, the minimum order has to work alongside a flooring order instead of demanding its own container, and the lead times have to run together so a customer is not waiting on handrail after the floor has already shipped.

Is the flooring still the leading product?

Yes. The flooring carries the specification and is decided first in the room. The accessories exist to finish that specification, which is why they sell best in the same conversation.

Building a Healthcare Floor and Wall System?

Send the room schedule and the wall protection requirement. We will come back with the sheet, the cove detail, the handrail sections and one set of documents covering all of them.

Ask for a System Quote